Concrete pools, engineered to the block.
Steep, rocky, rooftop or tight. Drawn, engineered and poured across Sydney since 1968.
Family owned in Belrose. Over 1,000 pools. NSW Lic. 246552C
Recent pools in Avalon, North Bondi, Vaucluse, Darling Point, The Rocks and Bellevue Hill. See the projects
One family, one material, since 1968
Wright Pools opened on the Northern Beaches in 1968 and has built in steel-reinforced concrete ever since. The business is still family owned. Sons and grandsons of the founder run the projects.
The unglamorous parts are done properly. A soil test before the design. A shell engineered to the block, not to a template, by our own team. The same supervisor on site from the first cut until the cover goes on.
Start with your block
Every Wright pool is drawn for the site it sits on. Pick the ground and the pool you have in mind. The section redraws to show how we would build it, next to a pool we have already built like it.
Northern Beaches Residence
The brief arrived on one sheet of butter paper: a line, a curve, and the height of the coping over the lawn.
The shell was poured to suit the slope, with honed bluestone coping running the full length and a glass mosaic interior. The pool sits flush with the terrace on the house side and steps down to a lower deck at the far end.
On the spillway face the water sits 30 mm above the coping. A quiet feature, drawn into the architecture.
- Pool
- Spillway pool on a sloping garden
- Coping
- Honed bluestone, full length
- Interior
- Glass mosaic
- Shell
- Steel-reinforced concrete, shaped to the slope
Recent pools, from The Rocks to Vaucluse
All projectsHotels, hospitals, swim clubs and a zoo, on the same shell
Commercial pools since 1982, built to commercial code by the team that builds our homes. Select a project to see it.
Sixteen weeks on a clean run
It starts with a free site visit: we walk the block, look at the slope, the access and the light, and tell you what it can take. A clean run takes sixteen weeks. Most builds land between 14 and 20, depending on access and soil.
- Weeks 1–4
Design and engineering
Site visit and soil test. Concept drawings with you and your architect. Structural engineering in house. A costed scope of work, and materials ordered.
- Weeks 5–9
Excavation and shell
Site set-up and excavation. Steel reinforcement, then the shotcrete shell and its cure. First plumbing rough-in, with pool fencing during the cure.
- Weeks 10–13
Coping, tiling and finish
Coping set. Interior tiling, pebble or quartz. Lighting and plant installed: pump, filter, heating and sanitation.
- Weeks 14–16
Fill, commission, handover
Fill and balance the water, commission the plant, walk through it all with you, cover on. A 30-day and a 6-month check are booked.
What clients say
Fantastic job on our Northern Beaches pool. Tight access and major sandstone excavation. The project manager had a great eye for detail and the level of finish is superb.”
“Highly professional throughout. They suggested a project fit for purpose, delivered on time, and the finished product is to a high standard. The pool feels as good as new.”
“The experience was fantastic from start to finish. Punctual, professional, clear communication, and the quality of workmanship was outstanding. The pool was beyond our expectations.”
Over 1,000 pools since 1968
The next one starts with a site visit
The first visit is on us. Bring the drawings if you have them. If you have an architect, we work with them directly.
Mon to Fri, 8:00am to 5:00pm. Weekends by appointment. Belrose NSW.